PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Placing 3-4 gravel insde Stair -5 pit Facing West (800x600).jpg Started installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Started installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing East (800x600).jpg Underground roughing for sanitary sewer by Elev. 1,2,3 Facing South (800x600).jpg Underground storm piping along column line 2.5 Facing South-East (800x600).jpg Backfilling underground roughing along column line 2.5 between G-K Facing East (800x600).jpg Electricicans working on the underground piping by the bridge Facing Cherry Street (800x600).jpg Placed 3-4 gravel inside Stair -5 pit Facing West (800x600).jpg Started installing metal decking at Derrick -3 (3rd Floor) fromcolumn lines H-M to 4-6 Facing North (800x600).jpg
Previous pageNext page Underground storm piping along column line 2.5 Facing South-East (800x600)
Underground storm piping along column line 2.5 Facing South-East (800x600)